Overview
Infrastructure investigations establish the ground conditions that affect design and construction. Borehole locations and test intervals should reflect the proposed structures, load paths and areas of uncertainty.
Drilling methods
Methods below describe typical industry practice. Confirm project availability, delivery responsibilities and technical requirements during quotation.
Civil boreholes and rock coring
Soil and rock boreholes help define stratigraphy, rockhead and groundwater for roads, airports, utilities and industrial works. Coring and sampling can support foundation assessment for bridges and other structures.
Slopes and monitoring
Drilling can support investigations of cuttings and unstable slopes. Monitoring installations can help track movement or groundwater where specified by the engineer.
Construction drilling interfaces
Investigation drilling provides design information. Installation of anchors, soil nails or micropiles is a separate construction scope with its own design, acceptance and delivery requirements.

